Field Problem / Customer Requirement
A 320 MW gas turbine diffuser (3,800 × 2,600 mm) needed a Hot-to-Cold joint. It connects an uninsulated flange to a lined duct. Continuous +620°C (+680°C peak) exhaust risked conductive overheating of the clamping zone.
BundleTec Innovation and Engineering Solution
BundleTec engineered a monolithic AISI 310S (1.4845) hot frame with welded AISI 304/310S cooling fins across L_inst = 320 mm. ISO 12241 heat-transfer modeling dissipates flange conduction before the belt clamp.
A 1200°C CMS-Bio bolster pairs with Inconel 625 silica cloth and PTFE/FKM. Core +620°C gas drops below 60°C externally (ISO 13732-1).
Tested to RAL-GZ 719 (EN 1593 Nekal® ≥50 hPa) and verified in FabricSim™. The unit surpassed 38,000 hours and 1,200 thermal cycles.
Do you have a similar process problem?
Consult Our Lead Engineers Now →Related Fabric Expansion Joint Series & FabricSim™ Simulation
For gas turbine exhaust and HRSG ducts facing +620°C to +1000°C thermal shock, explore our GtTec™ Series. Validate multi-layer thermal gradients and liner clearances in FabricSim™ Thermal Simulator.